Circular/Memo/Order No. |
Date |
Subject |
Download |
Infra/KCD/C&I/2010/Pt-IV/2021 |
26.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including construction of pile), with necessary Pipe line and Valve connection at Falta Industrial Park ( Sec-V)of WBIIDC , in the district of South 24 Pgs.-743504. |
|
Infra/KCD/C&I/2010/Pt-IV/2020 |
26.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including construction of pile), with necessary Pipe line and Valve connection including Dismantling of 300 cum RCC abandoned overhead reservoir adjacent to proposed Over Head Reservoir at Kalyani Industrial Park of WBIIDC, Chandmari More in the district of Nadia-741235. |
|
Infra/KCD/C&I/2010/Pt-IV/2019 |
26.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including Construction of Pile), With necessary Pipe line with Valve connection at Kharagpur Industrial Park of WBIIDC Nimpura , in the district of Pashim Midnapur-721301. |
|
Infra/Eng/1W-12/86/VIII/2018 |
26.09.2024 |
Horticulture work for beautification of the Uluberia Industrial Park of WBIIDC, Uluberia, Howrah, Pin-711409. |
|
Infra/KCD/C&I/2010/Pt-IV/1836 |
03.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including construction of pile), with necessary Pipe line and Valve connection at Falta Industrial Park ( Sec-V)of WBIIDC , in the district of South 24 Pgs.-743504. |
|
Infra/KCD/C&I/2010/Pt-IV/1835 |
03.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including Construction of Pile), With necessary Pipe line with Valve connection at Kharagpur Industrial Park of WBIIDC Nimpura , in the district of Pashim Midnapur-721301. |
|
Infra/KCD/C&I/2010/Pt-IV/1834 |
03.09.2024 |
Construction of 300 cum capacity, 20 Mtr. staging height RCC Over Head Reservoir (including construction of pile), with necessary Pipe line and Valve connection including Dismantling of 300 cum RCC abandoned overhead reservoir adjacent to proposed Over Head Reservoir at Kalyani Industrial Park of WBIIDC, Chandmari More in the district of Nadia-741235. |
|
Infra/Eng/1W-12/86/VIII/1833 |
03.09.2024 |
Horticulture work for beautification of the Uluberia Industrial Park of WBIIDC, Uluberia, Howrah, Pin-711409. |
|
Infra/IIDC/CGC/AEM-87/03/1775 |
28.08.2024 |
Maintenance of Industrial park with clearing of Jungles, cleaning of Drainage system & overhead reservoir cleaning at Coochbehar Industrial Park, PH-I, Under Coochbehar Division" ,Coochbehar-736156. |
|
Infra/Eng/6E/2023/1748 |
23.08.2024 |
Additional work at 3rd floor of Institute of Enviromental Studies AND Wetland Management Department of Enviroment, plot no-24, Block-DD, Sec-I, Salt Lake city, Kol-700064. |
|
Infra/Eng/6E/2023/1666 |
09.08.2024 |
Balance Furniture for Supply at the Chamber of the Director and Addl.Director of Institute of Environmental Studies and Wetland Management Department of Enviroment, plot no-24, Block-DD, Sec-I, Salt Lake city, Kol-700064 |
|
Infra/KCD/C&I/2010/Pt-IV/1624 |
06.08.2024 |
Construction of cross drainage structure and surface drain at Malda Industrial Park under WBIIDC, Narayanpur Malda-732128 |
|
Infra/Eng/Elect./Maintenance/2019/1621 |
06.08.2024 |
Street Light arrangement with energy efficient LED Luminaries AND GI Octagonal Poles at Malda Industrial Park, WBIIDC, Narayanpur, Malda (Phase-III Work), PIN 732101 |
|
Infra/Eng/Elect./Maintenance/2019/1620 |
06.08.2024 |
Street Light arrangement with energy efficient LED Luminaries AND GI Octagonal Poles at Kalyani Industrial Park, Phase-III WBIIDC, Kalyani (Phase-II Work), PIN 741235 |
|
Infra/Eng/Elect./Maintenance/2019/1619 |
06.08.2024 |
Street Light arrangement with energy efficient LED Luminaries AND GI Octagonal Poles at Kharagpur Industrial Park, WBIIDC, Kharagpur (Phase-II Work) PIN-721301 |
|
Infra/Eng/Elect./Maintenance/2019/1618 |
06.08.2024 |
Street Light arrangement with energy efficient LED Luminaries and GI Octagonal Poles at Bishnupur Industrial Park, WBIIDC, Bankura (Phase-II Work) pin-700202 |
|
Infra/KCD/C&I/2010/Pt-IV/1602 |
05.08.2024 |
Civil work regarding beautification (by planting trees) of Kharagpur Industrial Park.Nimpura, Paschim Medinipur, under WBIIDC, West Bengal- 721301 |
|
Infra/KCD/C&I/2010/Pt-IV/1601 |
05.08.2024 |
Supply, delivery, installation, testing and commissioning of fire fighting system along with 150 KL capacity under ground reservoir and pump house related to fire fighting system at Sector III, IV and V of Falta Industrial Park under WBIIDC, South 24 Pgs.PIN-743504. |
|
Infra/KCD/C&I/2010/Pt-IV/1600 |
05.08.2024 |
Civil work regarding beautification (by planting trees) of Raninagar Industrial Park.under Jalpaiguri Division, Raninagar, district Jalpaiguri, pin-735133. |
|
Infra/Eng/3P-1/81/Pt.-X/1314 |
28.06.2024 |
Sinking of 250 x 200 mm dia X 250 metre deep Tube well along with Pumping Machinery, electrical accessories including interconnection with existing pipe line at sector - A, Kharagpur Industrial Park, Nimpura, Dist.- Paschim Medinipore, PIN-721301. |
|
Infra/Eng/1W-12/86/VIII/1300 |
26.06.2024 |
Civil work regarding beautification (by planting trees) of Uluberia Industrial Park, Uluberia, Howrah, Pin-711409. |
|
Infra/Eng/6E/2023/1299 |
26.06.2024 |
Supply of Two Nos Godrej Interio CIGNUS Table (Size 2100x2250x750) and Two nos Godrej Interio Marvel High Black Chair with 20 nos Godrej Interio Virtue Study Chair (Mild Steel Black) including Godrej Interio Ecliptic 3str sofa with Godrej Interio Alice Pro coffee table at Office of the Institute of Enviromental Studies and Wetland Management Department of Environment, Plot No-24, Block-DD, Sector-I, Salt Lake City, Kolkata-700 064 |
|
Infra/Eng/1E-Glowsign/2023/625 |
15.03.2024 |
Power Connection to the Two Nos. Glow Sign Boards at Malda Industrial Park under WBIIDC Dist- Malda |
|
Infra/Eng/1E-Glowsign/2023/624 |
15.03.2024 |
Power Connection to the Two Nos. Glow Sign Boards at Kalyani Industrial Park Phase-I & Phase-III under WBIIDC Dist- Nadia |
|
Infra/Eng/16E-A.M./2021/619 |
15.03.2024 |
Cutting of road sidem Jungle and Cleaning the premises at Kharagpur Industrial Park Sector B of WBIIDC Nimpura, P.O.-Rakhajungle, Dist-West Medinipur,PIN-721301. |
|
Infra/Eng/Elect/Maintenance/2019/411 |
29.02.2024 |
Annual Repair AND Maintenance of street light arrangement at Coochbehar Industrial Park Ph II of WBIIDC Chakchaka Dist-Coochbehar for the period of one year. |
|
Infra/Eng/Elect/Maintenance/2019/410 |
29.02.2024 |
Annual Repair AND Maintenance of street light arrangement at Coochbehar Industrial Park Ph I of WBIIDC Chakchaka Dist-Coochbehar for the period of one year. |
|
Infra/Eng/Elect/Maintenance/2019/409 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Raninagar Industrial Park of WBIIDC Raninagar Dist. Jalpaiguri for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/408 |
29.02.2024 |
Annual Repair AND Maintenance of street light arrangement at Malda Industrial Park of WBIIDC for the period of one year. |
|
Infra/Eng/Elect/Maintenance/2019/407 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Kalyani Industrial Park erstwhile Ph III of WBIIDC for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/406 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Kalyani Industrial Park erstwhile Ph I of WBIIDC for a period of One year. |
|
Infra/Eng/Elect./Maintenance/2019/405 |
29.02.2024 |
Repairing & Renovation LED street light pole, light fittings, power supply including Annual Repair & Maintenance of street light arrangement at Falta Industrial Park erstwhile (Sector V) of WBIIDC for a period of one year. |
|
Infra/Eng/Elect/Maintenance/2019/404 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Falta Industrial Park erstwhile Sector IV of WBIIDC for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/403 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Falta Industrial Park erstwhile SectorIII of WBIIDC for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/402 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Ulluberia Industrial Park of WBIIDC for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/401 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair AND Maintenance of street light arrangement at Kharagpur Industrial Park of WBIIDC for a period of One year. |
|
Infra/Eng/Elect/Maintenance/2019/400 |
29.02.2024 |
Repairing AND Renovation LED street light pole, light fittings, power supply including Annual Repair & Maintenance of street light arrangement at Bishnupur Industrial Park of WBIIDC for a period of One year |
|
Infra/Eng/Elect./OB/Saltlake/1W-2/2011/VI/331 |
21.02.2024 |
Annual engineering maintenance and repairing of electrical instalation at Head office of WBIIDC DJ-10, Sector-II, Salt lake city, Kolkata -91, for the period of one year. |
|
Infra/Eng/Elect./OB/Saltlake/1W-2/2011/VI/330 |
21.02.2024 |
Annual electrical repairing and maintance of Indoor sub station at Head office of WBIIDC DJ-10, Sector-II, Salt lake city, Kolkata -91, for the period of one year. |
|
Infra/Eng/1W-11/2010 (Pt.-III)/315 |
20.02.2024 |
Increase in Travel Height and number of stoppage and opening in the existing two nos Lift of OTIS Elevators and one no Lift of Bharat Elevators for proposed extension of 4th and 5th floor of Office building of WBIIDC at DJ 10, Sector II, Salt Lake City, Kolkata-700 091. |
|
Infra/Eng/1E-5/19/307 |
20.02.2024 |
Repairing and Strengthening internal road, From IOCL LPG Plant main Gate and front of Hindustan Coca Cola Beverages Pvt LTD, 2nd Phase to National Highway 31 D at Raninagar Industrial Park under WBIIDC, Raninagar, Jalpaiguri |
|
Infra/KCD/HO Renovation/2019/300 |
16.02.2024 |
Supply, delivery and fitting fixing of Air conditioning machines and its allied work at WBIIDC office building, DJ-10, SectorII, Salt Lake City, Kolkata-91. |
|
Infra/Eng/6E/2023/295 |
16.02.2024 |
Renovation, Modification of 2nd and 3rd Floor to create Two nos. New Chamber at Office of the Institute of Enviromental Studies and Wetland Management Department of Environment, Plot No- 24, Block - DD, Sector- I, Salt Lake City, Kolkata-700 064 |
|
Infra/Eng/6E/2023/294 |
16.02.2024 |
Renovation of Electrical installation work at Environmental studies and management building at plot no 24, block DD, sector-I, Saltlake city, Kolkata-700 064 |
|
Infra/1M-1/2000/Pt.-1/229 |
06.02.2024 |
Construction of R.C.C. Pavement at Falta Industrial Park, Sector V of WBIIDC , in the district of South24 Pgs., Pin-743504 |
|
Infra/1M-1/2000/Pt.-1/228 |
06.02.2024 |
Resectioning and developing of 2 nos of existing pond and land filling over low land within Bishnupur Industrial Park under WBIIDC in the District of Bankura, Pin-722122. |
|
Infra/1M-1/2000/Pt.-1/227 |
06.02.2024 |
Repairing, Renovation of Surface Drain and uplift of Existing drainage wall at Bishnupur Industrial Park of WBIIDC, in the district of Bankura, Pin-722122 |
|
Infra/1M-1/2000/Pt.-1/226 |
06.02.2024 |
Supply, delivery, installation, testing and commissioning of firefighting system along with 150 KL capacity under ground reservoir and pump house related to fire fighting system at Malda Industrial Park under WBIIDC, Narayanpur, Malda, Pin-732101 |
|
Infra/1M-1/2000/Pt.-1/225 |
06.02.2024 |
Construction of Covered drain & guard wall at Coochbehar Industrial Park Phase-I under WBIIDC, in the District of Coochbehar, Pin-736101 |
|
Infra/1M-1/2000/Pt.-1/224 |
06.02.2024 |
Sinking of 250 x 200 mm dia X 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at Phase-II of Coochbehar I Park, Chakchaka, Dist.-Coochbehar, Pin-736101 |
|
Infra/1M-1/2000/Pt.-1/223 |
06.02.2024 |
Construction of Boundary Wall at Kharagpur Industrial Park of WBIIDC Nimpura , in the district of Paschim Midnapur, Pin-721301 |
|
-- |
18.01.2024 |
Invitation for Expression of Interest of Design & Development of E-Office (File Tracking System) exclusively for WBIIDC |
|
Infra/KCD/HO Renovation/2019/2576 |
04.12.2023 |
Providing Aluminum sliding window or partition at WBIIDC Office at DJ-10, Sector-II, Salt Lake, Kolkata- 700 091 |
|
Infra/1M-1/2000/Pt.-1/2569 |
04.12.2023 |
Sinking of 250 x 200 mm dia X 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at sector - B Kharagpur IP, Nimpura, Dist.- Paschim Medinipore, pin-721301. |
|
Infra/1M-1/2000/Pt.-1/2533 |
29.11.2023 |
Widening and Widening and Repairing of Road and Construction of rotary at the turning point near CWC at Kharagpur Industrial Park Sector- B of WBIIDC, Nimpura, P.O.- Rakhajungle, West Medinipur, PIN-721301. |
|
Infra/1M-1/2000/Pt.-1/2532 |
29.11.2023 |
Widening and Repairing of Internal Road from entrance point to the junction point near CWC unit at Kharagpur Industrial Park Sector- B of WBIIDC, Nimpura, P.O.-Rakhajungle, Dist-West Medinipur, PIN-721301 |
|
Infra/1M-1/2000/Pt.-1/2530 |
28.11.2023 |
Repairing and renovation of 70000 gallon r.c.c. Overhead reservoir at WBIIDC Kalyani Industrial Park, Phase III, near medicare, pin-741235 |
|
Infra/1M-1/2000/Pt.-1/2529 |
28.11.2023 |
Construction of R.C.C. Pavement at Falta Industrial Park Sector IV of WBIIDC, in the district of South 24 Pgs.Pin- 743504 |
|
Infra/1M-1/2000/Pt.-1/2528 |
28.11.2023 |
Construction of Covered Drain at Falta Industrial Park Sector IV of WBIIDC, in the district of South 24 Pgs.Pin-743504 |
|
Infra/1M-1/2000/Pt.-1/2527 |
28.11.2023 |
Repairing and renovation of 227kl r.c.c. Overhead reservoir at WBIIDC Falta Industrial Park, phase III, south 24 pgs. pin- 743504 |
|
398MD/2C-687/23 |
10.10.2023 |
Tender document for purchasing Microscope |
|
Infra/KCD/AM/2009(Pt-II)/2243 |
29.09.2023 |
Wooden Flooring and Painting of WBIIDC Office at DJ-10, SectorII, Salt Lake, Kolkata- 700 091 |
|
Infra/KCD/AM/2009(Pt-II)/2162 |
15.09.2023 |
Providing Vitrified Tiles at WBIIDC Office at DJ-10, Sector-II, SaltLake, Kolkata- 700 091 |
|
Infra/KCD/AM/2009(Pt-II)/2161 |
15.09.2023 |
Polishing work at Office of WBIIDC at DJ10, Sector-II, SaltLake, Kolkata- 700 091 |
|
Infra/KCD/AM/2009(Pt-II)/2011 |
22.08.2023 |
Repairing, Renovation and Painting of Office Of The Chairman WBIIDC at Plot No.-10, Block-DJ, Sector-II, SaltLake City, Kolkata-700091 |
|
4160/Admn/36/GC/2023 |
17.08.2023 |
Second call for EOI no. GCG/EOI/ENQ_2/2023 dated 17.08.2023 |
|
Infra/Eng/1E-5/2019/1893 |
07.08.2023 |
Repairing of Bituminous Road at Raninagar Industrial Park of WBIIDC in the district of Jalpaiguri, West Bengal, PIN-735101 |
|
Infra/Eng/1W-3/2014/1850 |
01.08.2023 |
Installation of False celling in office of the Executive Engineer (C), South 24 Pgs Division, Falta, 24 PGS South, Pin-743504 |
|
Infra/Eng/Mech/SS/1W-1/17/1788 |
25.07.2023 |
Renovation, Supply, Installation, Testing and Commissioning of VRF HVAC system in Replacement of old damaged units at 4th Floor 'A' wing, Department of Industries and Commerce, Shilpa Sadan, 4 Abanindranath Tagore Sarani, Kolkata-700016 |
|
Infra/Eng/1W-3/2014/1753 |
19.07.2023 |
Installation of False celling in office of the Executive Engineer (C), South 24 Pgs Division, Falta, 24 PGS South, Pin-743504 |
|
Infra/1W-28/77/Part-II/1741 |
18.07.2023 |
Repair and Renovation and also electrical installation including Fan & Light fittings and installation of inverter to complete the office building for running smoothly at Kalyani I.P. Nadia |
|
Infra/Eng/1E-glowsign/2023/1711 |
13.07.2023 |
Supply, delivery, installation, testing, commissioning of Glow Sign Boards and Road Signage as required for Malda Industrial Park, Narayanpur, Malda and Kalyani Industrial Park, Kalyani, Nadia of WBIIDC. |
|
Infra/Eng/1W-3/2014/1565 |
26.06.2023 |
Installation of False celling in office of the Executive Engineer (C), South 24 Pgs Division, Falta, 24 PGS South, Pin-743504 |
|
Infra/1W-28/77/Part-II/1563 |
26.06.2023 |
Repair and Renovation and also electrical installation including Fan & Light fittings and installation of inverter to complete the office building for running smoothly at Kalyani I.P. Nadia |
|
Infra/KCD/AM/2009(Pt-II)/1558 |
23.06.2023 |
Horticulture at 1st and 2nd Floor of WBIIDC Office Building at DJ10, Sector-II, Salt Lake, Kolkata-91 for the period from July , 2023 to June, 2024 |
|
Infra/Eng/3P-2/88(Pt.-VIII)/1555 |
23.06.2023 |
Inter connection of water distribution pipe line with the overhead reservoir including supply and fitting of valve & its chamber, reservoir pipe line repairing ,reservoir pipe painting etc. at Sector- IV of WBIIDC Falta Industrial Park, Dist.-24 Parganas(South)pin-743504 |
|
Infra/ Eng/1E-glowsign/2023/1468 |
12.06.2023 |
Supply, delivery, installation , testing, commissioning of Glow Sign Boards and Road Signage as required for Malda Industrial Park, Narayanpur, Malda and Kalyani Industrial Park, Kalyani, Nadia of WBIIDC. |
|
Infra/Eng/Elect./Maintenance/2019/1467 |
12.06.2023 |
Repair AND Renovation work with change of Solar Power Inverter of 10KWp ON - GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Kalyani Industrial Park erstwhile (Ph-I and PhIII), Uluberia , Falta Industrial Park earstwhile (Sector III and IV) of W.B.I.I.D.C. |
|
Infra/MIGC/1W-12/16-17/1327 |
19.05.2023 |
Street Lights arrangement with energy efficient LED Luminaires and GI Octagonal Pole at Malda Industrial Park, WBIIDC, Phase-I, Narayanpur, Malda |
|
Infra/Eng/1W-9/2017/1239 |
08.05.2023 |
Construction of surface drain along with one number cross drainage structure at Dabgram Industrial Park under WBIIDC, Dabgram, Jalpaiguri |
|
Infra/Eng/5E-Survey/2021/1216 |
04.05.2023 |
Digital Survey work at Industrial Park of Haldia at Purba Medinipur Division of West Bengal showing all permanent features i.e. roads, pavement,drain nullah, waterbodies, temple, Masjid, electrical towers,OHR, pump house etc. and boundary of each allotted unit, including cleaning of jungles interfering the survey work as per scope of work complete in all respect at Haldia Industrial Park, District Purba Medinipur. |
|
Infra/Eng/3P-1/90/V/1221 |
04.05.2023 |
Supply, delivery, installation, testing and commissioning of Goods Elevator of 1.5 Ton capacity at Office of G + 3 Storied Building for Skilled Development Cum Training Centre at Bishnupur Industrial Park, Dwarika, District-Bankura,Pin722122. |
|
Infra/KCD/AM/2009(Pt-II)/1098 |
18.04.2023 |
Maintenance work of WBIIDC Office Building and 1st Floor at DJ10, Sector-II, Salt Lake City, Kolkata700 091 for the period upto 31.03.2024. |
|
Infra/MIGC/1W-12/16-17/1042 |
12.04.2023 |
Street Lights arrangement with energy efficient LED Luminaires and GI Octagonal Pole at Malda Industrial Park, WBIIDC, Phase-I, Narayanpur, Malda. |
|
Infra/Eng/3P-1/90/V/1038 |
12.04.2023 |
Supply, delivery, installation, testing and commissioning of Goods Elevator of 1.5 Ton capacity at Office of G + 3 Storied Building for Skilled Development Cum Training Centre at Bishnupur Industrial Park, Dwarika, District-Bankura, Pin-722122. |
|
Infra/1M-1/2000/Pt-I/1010 |
10.04.2023 |
Land filling over 2 acres low land adjacent to Kalyani -Barrackpore Expressway at Kalyani Industrial Park under WBIIDC, Kalyani, Nadia, Pin-741235. |
|
Infra/Eng/3P-2/88(Pt.-VII)/1008 |
10.04.2023 |
Sinking of 250 x 200 mm dia 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at Falta Industrial Park,Sector-III,under WBIIDC in the district of South 24 Parganas, Pin-743504. |
|
Infra/Eng/16E-A.M./2021/1007 |
10.04.2023 |
Repairing and Cleaning of 2500 mtr underground RCC hume pipe drainage system at Falta Industrial Park,Sector-IV under South 24 parganas Division, Falta WBIIDC, Pin-743504. |
|
Infra/Eng/Mech/SS/1W-1/17/992 |
06.04.2023 |
Renovation, Supply, Installation, Testing & Commissioning of VRF HVAC system in Replacement of old damaged units at Department of Industries, Commerce & Enterprises, Shilpa Sadan, 4 Abanindranath Tagore Sarani, Kolkata-700016 |
|
Infra/1M-1/2000/Pt-I/967 |
04.04.2023 |
Construction of Cross Drainage Structure & Drainage system improvement at WBIIDC Uluberia Industrial Park, Pin-711409 |
|
Infra/Eng/Elect./Maintenance/2019/955 |
31.03.2023 |
Repair and Renovation work of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Uluberia Industrial Park of W.B.I.I.D.C. |
|
Infra/Eng/Elect./Maintenance/2019/954 |
31.03.2023 |
Repair and Renovation work with change of Solar Power Inverter and some solar module of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Falta Industrial Park erstwhile sector-IV of W.B.I.I.D.C |
|
Infra/Eng/Elect./Maintenance/2019/953 |
31.03.2023 |
Repair Renovation work with change of Solar Power Inverter & some solar module of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Falta Industrial Park erstwhile sector-III of W.B.I.I.D.C |
|
Infra/Eng/Elect./Maintenance/2019/952 |
31.03.2023 |
Repair and Renovation work of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Kalyani Industrial Park erstwhile Ph-IIII of W.B.I.I.D.C. |
|
Infra/Eng/Elect./Maintenance/2019/951 |
31.03.2023 |
Repair & Renovation work with change of Solar Power Inverter of 10KWp ON - GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Kalyani Industrial Park erstwhile (Ph-I ) of W.B.I.I.D.C. |
|
Infra/Eng/1E-glowsign/2023/884 |
28.03.2023 |
Supply, delivery, installation , testing, commissioning of Glow Sign Boards and Road Signage as required for Kalyani Industrial Park of WBIIDC, Kalyani, Nadia, West Bengal, PIN-741235 |
|
Infra/Eng/1E-glowsign/2023/883 |
28.03.2023 |
Supply, delivery, installation, testing, commissioning of glow sign board on M.S. structure, as required for Malda Industrial Park, Narayanpur, Dist - Malda |
|
Infra/Eng/Elect./Maintenance/2019/815 |
23.03.2023 |
Repair and Renovation work with change of Solar Power Inverter and some solar module of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Falta Industrial Park erstwhile sector-IV of W.B.I.I.D.C. |
|
Infra/Eng/Elect./Maintenance/2019/814 |
23.03.2023 |
Repair and Renovation work with change of Solar Power Inverter and some solar module of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Falta Industrial Park erstwhile sector-III of W.B.I.I.D.C |
|
Infra/Eng/Elect./Maintenance/2019/813 |
23.03.2023 |
Repair and Renovation work of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Uluberia Industrial Park of W.B.I.I.D.C. |
|
Infra/Eng/Elect./Maintenance/2019/812 |
23.03.2023 |
Repair and Renovation work of 10KWp ON GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Kalyani Industrial Park erstwhile Ph-III of W.B.I.I.D.C. |
|
Infra/Eng/Elect./Maintenance/2019/811 |
23.03.2023 |
Repair & Renovation work with change of Solar Power Inverter of 10KWp ON - GRID System Solar photo voltaic power plant including annual maintenance of the installations for one year at Kalyani Industrial Park erstwhile (Ph-I ) of W.B.I.I.D.C |
|
Infra/Eng/3P-1/90/V/768 |
21.03.2023 |
Supply, delivery, installation, testing & commissioning of Goods Elevator of 1.5 Ton capacity at Office of G + 3 Storied Building for Skilled Development Cum Training Centre at Bishnupur Industrial Park, Dwarika, District - Bankura, Pin-722122. |
|
Infra/Eng/Mech/SS/1W-1/17/728 |
17.03.2023 |
Renovation, Supply, Installation, Testing & Commissioning of VRF HVAC system in Replacement of old damaged units at Department of Industries, Commerce & Enterprises, Shilpa Sadan, 4 Abanindranath Tagore Sarani, Kolkata700016. |
|
Infra/1M-1/2000/Pt-I/698 |
15.03.2023 |
Land filling over 2 acres low land adjacent to Kalyani-Barrackpore Expressway at Kalyani Industrial Park under WBIIDC, Kalyani, Nadia, Pin-741235 |
|
Infra/Eng/16E-A.M./2021/681 |
13.03.2023 |
Removal of Sludge/Spoils accumulated at Out fall/Down stream of the Existing Swearage system at Falta Industrial Park, Sect-IV under South 24 parganas Division, Falta WBIIDC, Pin-743504 |
|
Infra/Eng/3P-2/88(Pt.-VII)/680 |
13.03.2023 |
Sinking of 250 x 200 mm dia 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at Falta Industrial Park, Sector-III, under WBIIDC in the district of South 24 Parganas, Pin-743504. |
|
Infra/Eng/16E-A.M./2021/679 |
13.03.2023 |
Repairing and Cleaning of 2500 mtr underground RCC hume pipe drainage system at Falta Industrial Park, SectorIV under South 24 parganas Division, Falta WBIIDC, Pin-743504 |
|
Infra/Eng/Mech/SS/1W-1/17/606 |
02.03.2023 |
Renovation, Supply, Installation, Testing & Commissionig of VRF HVAC system in Replacement of old damaged units at Department of Industries, Commerce & Enterprises, Shilpa Sadan, 4 Abanindranath Tagore Sarani, Kolkata-700016. |
|
Infra/Eng/8E-Mech/W.S./202/579 |
01.03.2023 |
Water distribution pipe line from Tube Well no-1 to Almaties alumina Pvt. Ltd. at WBIIDC Sector-III, Falta Industrial Park, Dist- South 24 Parganas, Pin-743504. |
|
Infra/1M-1/2000/Pt-I/536 |
24.02.2023 |
Construction of covered surface drain for eight number of plots alotted at Malda Industrial Park (Phase1) WBIIDC, Pin-732128. |
|
Infra/1M-1/2000/Pt-I/515 |
23.02.2023 |
Land filling over 2 acres low land adjacent to Kalyani - Barrackpore Expressway at Kalyani Industrial Park under WBIIDC, Kalyani, Nadia..Pin-741235. |
|
Infra/ Eng/1E-glowsign/2023/505 |
22.02.2023 |
Supply, delivery, installation , testing, commissioning of Glow Sign Boards and Road Signage as required for Kalyani Industrial Park of WBIIDC, Kalyani, Nadia, West Bengal, PIN-741235 |
|
Infra/ Eng/1E-glowsign/2023/504 |
22.02.2023 |
Supply, delivery, installation, testing , commissioning of glow sign board on M.S. structure, as required for Malda Industrial Park,Narayanpur, Dist.- Malda |
|
Infra/Eng/1E-glow sign/2023/461 |
20.02.2023 |
Supply, laying and connection of power cable to the four numbers Glow Sign Board at Kalyani Industrial Growth Centre, Kalyani, Dist.- Nadia. |
|
Infra/Eng/16E-A.M./2021/446 |
17.02.2023 |
Cleaning , Repairing of Drain and Cutting of Jungles from road side at Raninagar Industrial Park , WBIIDC, Raninagar, Jalpaiguri, Pin-735101 |
|
Infra/Eng/16E-A.M./2021/445 |
17.02.2023 |
Cleaning and repairing work of existing surface drain and Junglee Cutting at WBIIDC, Malda Industrial Park, Pin-732101. |
|
Infra/Eng/16E-A.M./2021/444 |
17.02.2023 |
Jungle Cutting and Cleaning AND repairing work of Existing swearage and drainage system including jungle cutting of either side of internal road flank at Falta Industrial Park, Sec-III under South 24 parganas Division, Falta, Pin-743504 |
|
Infra/Eng/16E-A.M./2021/430 |
16.02.2023 |
Jungle Cutting and total drain cleaning at Kalyani Industrial Park(Ph-I & Ph- III) of WBIIDC at Kalyani,Nadia, Pin-741235 |
|
Infra/Eng/16E-A.M./2021/429 |
16.02.2023 |
Jungle Cutting and total drain cleaning at Uluberia Industrial Park of WBIIDC at Birshibpur, Howrah, Pin-711409 |
|
Infra/Eng/8E-Mech/W.S./2021/428 |
16.02.2023 |
Operation and maintenance of pumping machineries including maintenance of whole pipe line network for day to day water supply to entrepreneurs smoothly along with emergency water supply operation for firefighting at Falta Industrial Park, SectorIII & IV, District:- 24 Pgs(South) for the calendar 365 days..pin-743504 |
|
Infra/1M-1/2000/Pt-1/387 |
13.02.2023 |
Construction and upgradation of multi-access road network along with footpath at at Malda Industrial Park (Phase-1) improving last mile connectivity WBIIDC,Pin-732128 |
|
Infra/1M-1/2000/Pt-1/384 |
13.02.2023 |
Development of Common Facilities and Development Centre Building at Bishnupur Industrial Park under WBIIDC, Dwarika, Bishnupur in the District of Bankura,Pin-722122. |
|
Infra/1M-1/2000/Pt-1/385 |
13.02.2023 |
Construction of new RCC Culvert approaching to proposed allotted land at Malda Industrial Park (Phase-1) WBIIDC,Pin-732128 |
|
Infra/1M-1/2000/Pt-1/386 |
13.02.2023 |
Construction of new road approaching to proposed allotted land at Malda Industrial Park (Phase-1) to improve the connectivity with the Industrial Park, WBIIDC,Pin-732128 |
|
Infra/Eng/1E-glow sign/2023/361 |
09.02.2023 |
Supply, laying and connection of power cable to the four numbers Glow Sign Board at Kalyani Industrial Growth Centre, Kalyani, Dist.- Nadia. |
|
Infra/1M-1/2000/Pt-I/317 |
07.02.2023 |
Construction ofInternal Road at Kalyani Industrial Park, Phase-III,adjacent to Barackpur Kalyani Express Way, Back side of Gourika Auto, under WBIIDC, Kalyani, Nadia, Pin-741235. |
|
Infra/1M-1/2000/Pt-I/314 |
07.02.2023 |
Land filling over 2 acres low land adjacent to Kalyani - Barrackpore Expressway at Kalyani Industrial Park under WBIIDC, Kalyani, Nadia, Pin-741235. |
|
Infra/Eng/1W-2/93/II/278 |
06.02.2023 |
Electrical installation of G + 3 Storied Building for Skill Development Cum Training Centre at Bishnupur Industrial Growth Centre, Dwarika, District - Bankura. |
|
Infra/1M-1/2000/Pt-I/281 |
06.02.2023 |
Sinking of 250 x 200 mm dia 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at Kalyani Industrial Park, Phase I, under WBIIDC in the district of Nadia.Pin-741235. |
|
Infra/1M-1/2000/Pt-I/277 |
06.02.2023 |
Sinking of 250 x 200 mm dia 250 metre deep Tubewell along with Pumping Machinery, elecetrical accessories including interconnection with existing pipe line at Malda Industrial Park, Phase I, under WBIIDC in the district of Malda.Pin-732128. |
|
Infra/1M-1/2000/Pt-I/276 |
06.02.2023 |
Laying water supply pipeline from inlet point of firefighting reservoir to eight number of plots alotted and repairing of pipe line of overhead reservoir at Malda Industrial Park Phase-1,WBIIDC,Pin-73212 |
|
Infra/1M-1/2000/Pt-I/275 |
06.02.2023 |
Construction of covered surface drain for eight number of plots alotted at Malda Industrial Park (Phase-1) WBIIDC,Pin-7321 |
|
WBPPDCL/Tender/OS/03 |
02.02.2023 |
Procurement of Finished products |
|
ICE/AS/e-NIT01/2022-23 |
05.08.2022 |
Deployment of Annual Security, Operation and Maintenance Services Personnel at SHILPA SADAN, 4, Abanindranath Tagore Sarani, Kolkata - 700016 |
|